Masterbathroom has new two sink vanity in, the shower is tiled, the granite tile will be done this weekend, then we have to replace the back door (it leaks big time) then the room can get carpeted. Then I can actually have a bedroom.
The family room still needs texturing and paint. The kitchen still needs floor tile, cabinets, appliances, marble tile counters, pretty much everything.
its been 3 months without a kitchen and bedroom, and nowhere to put any of my stuff. This has been tougher than I thought.
Pictures are coming.
.jpg)
No comments:
Post a Comment