Ok, we are still texturing some parts of the house, but mostly done. Today we were electricians installing recessed lighting. Tomorrow we go back to sheetrock and mud. Plumbing work is now 90% done. All we have to do is put in the P-Traps, and cover plates once the cabinets are in. Tile is now being decided on. Im down to 3 choices, from a lot. We have to run new joists between the green metal joists under the floor to prevent any bouncing. This would cause grout cracks after just a few months. We dont want that to happen....